INDUSTRIAL TCE SITE
BRAMPTON

Situation:​
  • Approximately 4250 m3 of TCE impact in the soil and groundwater.

  • After years of manufacturing, TCE had migrated into the soil and groundwater underneath the building and areas under the parking lot and driveways.

  • Active business on site.  Remediation plan must allow for business to continue operations during implementation.

 
Task:
  • Remediate soil and groundwater in-situ as to not interrupt day to day operations of business.

  • Install injection wells inside building and operating parking and drive areas using flush mount caps and removable injection heads.

  • Inject organic carbon substrate with micronized ZVI into impacted areas.

  • Ensure site is clean to ensure minimal disruption to operations.

 
Result
  • Business continued operations uninterrupted during injection process.

  • Consultant confirmed amendment had spread throughout contaminant zone.

  • 3 of 4 monitoring wells met MECP Table 3 standards between 6 and 24 months.

  • Few residual daughter compounds in select monitoring wells at 24 months.

  • Reducing conditions still active in substrate at 24 months.

  • Engineering Consultant remarks at 24 month monitoring event; “Overall the results are again very positive. We are seeing VOC concentrations decrease significantly at the Site.”
    (GHD Report 24 Month Performance Monitoring Result)

IMG_5770.avif

OIL SPILL IN BEDROCK
BROCKVILLE

Situation:​
  • Approximately 600 litres of heating fuel discharged from the holding tank inside the garage adjacent to the home

  • Oil had migrated beneath into the bedrock and made its way into the well which supplied the home

  • Oil was seen coming from the taps of the home

  • Three car garage, all brick, raised bungalow of approximately 4000 sq.ft built on top of limestone bedrock

 
Task:
Emergency cleanup procedures:
  • Established clean water supply for residence and flushed plumbing system

  • Used existing water well as recovery well and installed Mobile Treatment Unit (MTU) to establish hydraulic containment

 
Use Chemical Oxidation using Stabilized Hydrogen Peroxide:
  • Used BIM200 to remediate impacted concrete floor

  • Installed screened wells along perimeter of impacted zone

  • Installed injection point at source of impact

  • Installed injection system connecting all wells

  • Used existing water well as recovery well, injected stabilized hydrogen peroxide into screened wells and drew towards recovery well

  • Upon achieving MOE compliance standards, decommissioned former water well and installed new well up stream as water supply

 
Result
  • Successful remediation achieved in 4 months

  • Saved the home

  • Home owners continued to live in the house during the remediation process

Brockville House.avif
Brockville Tank.avif
Brockville Pump Sys.avif

HEXAVALIENT CHROMIUM
INDUSTRIAL FACILITY 

ONTARIO

Situation:​
  • Manufacturing facility using hexavalent chromium in their processes for over 45 years.

  • More than one historical spill of hexavalent chromium reported at the facility.

  • Heavily impacted ground water zone approximately 1300 m3.

  • Client needed to remediate the saturated zone before tenant could move in.

 
Task:
Place micronized ZVI into the target zone:
  • Approximately 45 cubic meters of micronized zero valent iron was to be placed in the saturated zone.

  • Approximately 109, 2" core holes were drilled through the concrete for direct push access. 

  • ZVI was mixed with a suspension agent and then injected into the target zone.

  • Approximately 220,000 liters of amendment was injected into the target zone.  

 
Result
  • Successful remediation achieved in 4 months

  • All monitoring wells came back compliant with MECP standards.  

  • Tenant moved in on schedule.

20221005_114447.jpg
20221025_152607.jpg

Toll Free: 1-800-414-2404

Office:      705-726-3921

2207 Penetanguishene Rd.

Barrie, ON  L4M 4Y8

  • LinkedIn

Contact Info

Our customer service team is here to answer any questions, please use this form or contact us directly via email or phone.

© 2025 by Golden Environmental Services
Powered and secured by Wix

bottom of page